Friday, December 18, 2009

New options!


Kitchen with solid beech worksurface

Friday, July 24, 2009








It looks so big, but it is cosy!

Pillings Lock









Take a look at the final touches...

Wednesday, May 20, 2009



The boat has office space or it could be a second bedroom depending on your needs


Get you socks on and slide down the hallway to the bathroom

The bedroom



The large double bedroom opens out onto the front deck

The finished interior: kitchen


The kitchen/ diner gives plenty of space to cook and entertain!

Friday, February 27, 2009

Looking through the boat


Looking through the living space towards the bedroom.
The kitchen will be built on the left of this space.

Bathroom sink


We have chosen a rectangular sink.

Sunday, February 22, 2009

Aluminium


Windows and shower reveals are lined with Jeremy's trademark aluminium trim.

Sunday, February 15, 2009

Bedroom



The built-in bed is finished. It has long term storage and two large roll-out drawers.
The bed head is part of the bulk head, with cut away shelf cubby holes, lined with silver leaf.

The exterior


The boat exterior is painted high gloss blue, green and cream.

The shower




With a curved, aluminium lined opening, tiled ice-blue interior and an enamelled exterior.
The shower is nearly complete.