Perula
Moored at Pillings Lock Marina, Barrow-upon-Soar
Friday, February 27, 2009
Looking through the boat
Looking through the living space towards the bedroom.
The kitchen will be built on the left of this space.
Bathroom sink
We have chosen a rectangular sink.
Sunday, February 22, 2009
Aluminium
Windows and shower reveals are lined with Jeremy's trademark aluminium trim.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)