Perula
Moored at Pillings Lock Marina, Barrow-upon-Soar
Sunday, February 15, 2009
Bedroom
The built-in bed is finished. It has long term storage and two large roll-out drawers.
The bed head is part of the bulk head, with cut away shelf cubby holes, lined with silver leaf.
The exterior
The boat exterior is painted high gloss blue, green and cream.
The shower
With a curved, aluminium lined opening, tiled ice-blue interior and an enamelled exterior.
The shower is nearly complete.
Newer Posts
Home
Subscribe to:
Posts (Atom)